The hydropower plant is located 28 Km to east of Izeh city in the northeast of Khuzestan province. The dam site is 610 Km from the mouth of the Karun River and at an air distance of about 140 kilometers from Ahvaz city. The main sources of the Karun River are from the Zardkouh Bakhtiari and the Zagros mountain range.
The phase I studies were began by Land and Water Resources Development Company and Acres Company (Canada) in 1978 and continued until 1989. The supplementary studies, as well as the phase II studies and detailed design were assigned to the Mahab Ghodss – Acres Joint Venture and were completed by 1993.
The construction of ancillary works, including access roads, bridges, and temporary camps began in 1991 and ended in 1994. The construction of dam and power plant began in 1994 and ended in 2004.
Dam Type | Double-Curvature Concrete Arch Dam |
Dam Height from Foundation (m) | 205 |
Dam Crest Length (m) | 462 |
Dam Crest Width (m) | 5.5 |
Dam Body Volume (m3) | 1,000*۱۰³ |
Total Reservoir Capacity (m3) | 3,000 *۱۰⁶ |
Active Reservoir Capacity (m3) | 1,750 *۱۰⁶ |
Average Annual River Discharge (m3) | 300 *۱۰⁶ |
Discharge Capacity of Spillways (m3/s) | 13,395 |
Powerhouse Type | Underground |
Number of Units | 8 |
Installed Capacity (MW) | 2,000 |
Average Annual Energy Generation (GWh) | 4,172 |